Titan-Energy_Case-Study_CHP_School

Case Study: Providing backup power and reducing cost for Connecticut high school

ChallengeWhile planning a CHP installation at a Connecticut high school, the district’s emergency generator at the nearby primary school seized and as a result, generated its final kilowatt with very little notice. Code requirements for public school facilities mandate them to have standby generators in the event of an emergency. Winter in Connecticut was fast…